Pictures of the Construction of the New Water Plant



Full Size Image
12-3-12 First Coat of Asphalt on West Side of Building


Full Size Image
11-28-12 Plate Settlers in Sedimentation Basin


Full Size Image
11-28-12 Fiberglass Grating Between Sedimentation Basin and Pipe Gallery


Full Size Image
9-26-12 West Wall Sfter Panel are Installed


Full Size Image
9-26-12 Attaching Panel to the Wall


Full Size Image
9-24-12 Looking into the Pipe Gallery and Filter Areas


Full Size Image
9-24-12 Looking into the far end of the Chemical Rooms


Full Size Image
9-24-12 Looking toward the Sedimentation Basins


Full Size Image
8-23-12 Looking into the Sedimentation Basins


Full Size Image
8-23-12 Looking toward the flocculators from the top of the clearwell


Full Size Image
8-23-12 One of the sedimentation basin plate settlers


Full Size Image
8-23-12 The generator


Full Size Image
7-10-12 Looking South into the Middle of the New Plant


Full Size Image
7-10-12 Looking South Along the West Side of the New Plant


Full Size Image
7-10-12 Looking South to the East Side of the New Plant


Full Size Image
7-10-12 Filter Area of the New Plant


Full Size Image
5-21-12 Air Burst Compresser sitting in the fiberglass enclosure inside the metal warehouse.


Full Size Image
5-21-12 Backfilling at the South end of the plant


Full Size Image
5-21-12 Chemical room looking from the clearwell


Full Size Image
5-21-12 Sedimentation Basin viewed from the NE corner of the plant.


Full Size Image
5-21-12 West wall being formed and poured


Full Size Image
4-03-12 Forming Decking for the Top Slab on the Clearwell


Full Size Image
4-03-12 Looking from the North to the South End of the lower level of the Slab and Walls


Full Size Image
2-07-12 Entire West Side of WTP with Base Stone Slab Elevation


Full Size Image
2-07-12 NW Corner of Clearwell - Forming it up to Pour Concrete


Full Size Image
1-31-12 Raw Water Pump Station and Valve Vault


Full Size Image
1-31-12 Drain Pump Station Being Built


Full Size Image
1-31-12 The Clearwell


Full Size Image
12-19-11 Lean Fill Being Added


Full Size Image
12-22-11 Pouring the East wall of the clearwell


Full Size Image
11-15-11 Picture showing the raw water river intake pit


Full Size Image
11-10-11 Picture showing the height of the excavation for the clearwell


Full Size Image
9-29-11 Distance picture showing the East shoring wall


Full Size Image
8-9-11 Close up of Project sign